學術審查期刊論文(Refereed Journal Papers) "Onsite Building Information Retrieval By Using Projection-Based Augmented Reality,"Yeh, K.C., Kang, S.C. and Tsai, M.H., Journal of Computing in Civil Engineering. (Accepted in July 28, 2011) "A Framework of Information Visualization for Multi-System Construction," Kuo, C. H., Tsai, M. H. and Kang, S. C. (2011), Automation in Construction, 20(3), 247-262.
研討會論文(Conference Papers) 『遠端吊車操作介面之資訊配置方式』,陳以蓁、紀宏霖、康仕仲、謝尚賢(2011),100年電子計算機於土木水利工程應用研討會,高雄,台灣。九月一日至二日。 『BIM-AR: A Projective Mobile Device』,葉鎧禎、蔡孟涵、康仕仲 (2010),第十四屆營建管理學術交流研討會,台北,台灣。七月二日。 "A Projective Mobile Device for Presenting Location-based Building Information in a Construction Site,"Yeh, K.C., Tsai, M.H. and Kang, S.C. (2010), Proceedings of 10th International Conference on Construction Applications of Virtual Reality (CONVR) Conference , Sendai, Japan. November 4-5. "Construction Dashboard: an Exploratory Information Visualization Tool for Multi-System Construction," Kuo, C. H., Tsai, M. H., Kang, S. C., Hsieh, S. H. (2009),Proceedings of 9th International Conference on Construction Applications of Virtual Reality (CONVR), Sydney, Australia. November 5-6. 『結合多點觸碰及動作偵測於手持式裝置瀏覽4D模型』,陳宜民、謝尚賢、康仕仲 (2009),98年電子計算機於土木水利工程應用研討會,新竹,台灣。九月三日至四日。 『互動式營建資訊顯示系統』,郭政翰,蔡孟涵,康仕仲,謝尚賢 (2009),第十三屆營建管理學術交流研討會,高雄,台灣。七月九日。 Usability Testing for a 4D Construction Management Software Package,”Pei, T. J, Kang, S. C., Hsieh, S. H., Tsai, M. H., Yeh, K. C. (2008). Proceedings of EASEC-11, Taipei, Taiwan. November 19-21. 『工程吊車操作與協同作業之視覺化系統』,紀宏霖、洪偉翰、康仕仲(2006),第十屆營建管理學術交流研討會海報論文,中壢,台灣。七月四日。 『設施設備維護管理之 BIM 導航系統』,陳威帆、謝尚賢(2011),100年電子計算機於土木水利工程應用研討會,高雄,台灣。九月一日至二日。
分析/模擬(Analysis/Simulation)
研討會論文(Conference Papers) 『應用BIM解決因工序導致空間衝突問題之初步研究』,南方英、謝尚賢(2011),100年電子計算機於土木水利工程應用研討會,高雄,台灣。九月一日至二日。 『導入 BIM 於捷運站旅客流量之動態模擬方法』,王峻品、柯冠宇、沈明毅、謝尚賢(2011),100年電子計算機於土木水利工程應用研討會,高雄,台灣。九月一日至二日。 "Boundary Generating Method for Collision Detection in Virtual Construction," Hung, W.H. and Kang, S.C. (2010).Proceedings of the 10th International Conference on Construction Applications of Virtual Reality (CONVR) Conference, Sendai, Japan. November 4-5. "Physics-Based Crane Model for the Simulation of Cooperative Erections," Hung, W. H., Kang, S. C. (2009).Proceedings of the 9th International Conference on Construction Applications of Virtual Reality (CONVR), Sydney, Australia, November 5-6.
導入/實施 (Implementation)
學術審查期刊論文(Refereed Journal Papers) "A three-stage framework for introducing a 4D tool in large consulting firms,"Tsai, M. H., Kang, S. C. and Hsieh, S. H. (2010).Advanced Engineering Informatics, 24(4), 476-489.
研討會論文(Conference Papers) “On Decision-making and Technology-implementing Factors for BIM Adoption,” Mom, M., Tsai, M.H. and Hsieh, S.H. (2011).Proceedings of the11th International Conference on Construction Applications of Virtual Reality (CONVR), Weimar, Germany. November 3-4. “Lessons Learnt from Customization of a BIM Tool through University-Industry Collaboration,”Tsai, M.H., Kang, S.C. and Hsieh, S.H. (2011).Proceedings of Conference on Computer Applications in Civil and Hydraulic Engineering 2011, Kaohsiung, Taiwan. September 01-02. "Experiences Using Building Information Modeling for a Construction Project," Tsai, M. H., Wu, C. H., Matin, Md.A., Fan, S. L., Kang, S. C., Hsieh, S. H. (2010).Proceedings of the International Conference on Computing in Civil and Building Engineering (ICCCBE) 2010, Nottingham, UK. June 30- July 2. “A Case study on Constructing 3D/4D BIM Models from 2D Drawings and Paper-based Documents Using a School Building Project,” Fan, S. L., Kang, S. C., Hsieh, S. H., Chen, Y. H., Wu, C. H. and Juang, J.R. (2009).Proceedings of the International Conference on Computational Design in Engineering (CODE), Seoul, Korea. November 3-6. “Workflow Re-engineering for Implementing a 4D Construction Management Tool in a Design-Build Project,” Tsai, M. H., Md, A. M., Kang, S. C., Hsieh, S. H. (2009).Proceedings of 2009 26th International Symposium on Automation and Robotics in Construction (ISARC), Austin, Texas, U.S. June 24-27. “Experiences on Study of Setting-up a 4D Construction Management Tool in a High-rise Construction Project,” Tsai, M. H., Kang, S. C., Hsieh, S. H., Kuo, C. H. ,Pei, T. J. Yeh, K. C. (2008).Proceedings ofICCCBE XII, Beijing, China. October 16-18. “Development and Application of 4D Construction Simulation Tools,” Liao, Y.F., Hsieh, S.H., Kang, S. C., Chen, C.S., Yang, C.T., Chi, H.L., Chi, W.C., and Yu, C.H. (2007).Proceedings of the Fourth Civil Engineering Conference in the Asian Region (CECAR).Taipei. June 25-28. 『4D 管理工具之導入案例研究』,蔡孟涵、康仕仲、郭政翰、謝尚賢 (2008),第十二屆營建管理學術交流研討會,高雄,台灣。七月三日。 『4D 管理系統在統包專案的應用研究』,蔡孟涵、康仕仲、謝尚賢 (2008),第十二屆營建管理學術交流研討會,高雄,台灣。七月三日。
期刊 Yeh, K.C., Kang, S.C. and Tsai, M.H. "OnsiteBuilding Information Retrieval By Using Projection-Based Augmented Reality," Journal of Computing in Civil Engineering. (Accepted in July 28, 2011) Kuo, C. H., Tsai, M. H. and Kang, S. C. (2011). "A Framework of Information Visualization for Multi-System Construction," Automation in Construction. 20(3), pp. 247-262. Tsai, M. H., Kang, S. C. and Hsieh, S. H. (2010). "A three-stage framework for introducing a 4D tool in large consulting firms," Advanced Engineering Informatics, 24(4), 476-489. Chang, H.S., Kang, S. C., and Chen, P.H. (2009), “Systematic Procedure of Determining an Ideal Color Scheme on 4D Models," Advanced Engineering Informatics, 23, 463-473.
研討會文章 Tsai, M.H., Kang, S.C. and Hsieh, S.H. (2011). “Lessons Learnt from Customization of a BIM Tool through University-Industry Collaboration,”Proceedings of Conference on Computer Applications in Civil and Hydraulic Engineering 2011, Kaohsiung, Taiwan. September 01-02. 陳以蓁、紀宏霖、康仕仲、謝尚賢(2011),遠端吊車操作介面之資訊配置方式,100年電子計算機於土木水利工程應用研討會,高雄,台灣。九月一日至二日。 謝尚賢、郭榮欽、郭瀚嶸(2011),BIM 課程之教學經驗分享,100年電子計算機於土木水利工程應用研討會,高雄,台灣。九月一日至二日。 陳威帆、謝尚賢(2011),設施設備維護管理之 BIM 導航系統,100年電子計算機於土木水利工程應用研討會,高雄,台灣。九月一日至二日。 南方英、謝尚賢(2011),應用BIM解決因工序導致空間衝突問題之初步研究,100年電子計算機於土木水利工程應用研討會,高雄,台灣。九月一日至二日。 王峻品、柯冠宇、沈明毅、謝尚賢(2011),導入 BIM 於捷運站旅客流量之動態模擬方法,100年電子計算機於土木水利工程應用研討會,高雄,台灣。九月一日至二日。 Mom, M., Tsai, M.H. and Hsieh, S.H. (2011). “On Decision-making and Technology-implementing factors for BIM adoption,” Proceedings of the11th International Conference on Construction Applications of Virtual Reality (CONVR), Weimar, Germany. November 3-4. Hung, W.H. and Kang, S.C. (2010). "Boundary Generating Method for Collision Detection in Virtual Construction," Proceedings of 10th International Conference on Construction Applications of Virtual Reality (CONVR) Conference , Sendai, Japan. November 4-5. Yeh, K.C., Tsai, M.H. and Kang, S.C. (2010). "A Projective Mobile Device for Presenting Location-based Building Information in a Construction Site,"Proceedings of 10th International Conference on Construction Applications of Virtual Reality (CONVR) Conference , Sendai, Japan. November 4-5. Tsai, M. H., Wu, C. H., Matin, Md.A., Fan, S. L., Kang, S. C., Hsieh, S. H. (2010). "Experiences Using Building Information Modeling for a Construction Project," Proceedings of The International Conference on Computing in Civil and Building Engineering (ICCCBE) 2010, Nottingham, UK. June 30- July 2. 葉鎧禎、蔡孟涵、康仕仲 (2010),『BIM-AR: A Projective Mobile Device』,第十四屆營建管理學術交流研討會,台北,台灣。七月二日。 Hung, W. H., Kang, S. C. (2009). "Physics-Based Crane Model for the Simulation of Cooperative Erections," Proceedings of 9th International Conference on Construction Applications of Virtual Reality (CONVR), Sydney, Australia. November 5-6. Kuo, C. H., Tsai, M. H., Kang, S. C., Hsieh, S. H. (2009). "Construction Dashboard: an Exploratory Information Visualization Tool for Multi-System Construction," Proceedings of 9th International Conference on Construction Applications of Virtual Reality (CONVR), Sydney, Australia. November 5-6. Fan, S. L., Kang, S. C., Hsieh, S. H., Chen, Y. H., Wu, C. H. and Juang, J.R. (2009). “A case study on constructing 3D/4D BIM models from 2D drawings and paper-based documents using a school building project,” International Conference Computational Design in Engineering (CODE), Seoul, Korea. November 3-6. Tsai, M. H., Md, A. M., Kang, S. C., Hsieh, S. H. (2009). “Workflow Re-engineering for Implementing a 4D Construction Management Tool in a Design-Build Project,” Proceedings of 2009 26th International Symposium on Automation and Robotics in Construction (ISARC), Austin, Texas, U.S. June 24-27. 郭政翰,蔡孟涵,康仕仲,謝尚賢 (2009),『互動式營建資訊顯示系統』,第十三屆營建管理學術交流研討會,高雄,台灣。七月九日。 陳宜民、謝尚賢、康仕仲 (2009),『結合多點觸碰及動作偵測於手持式裝置瀏覽4D模型』,98年電子計算機於土木水利工程應用研討會,新竹,台灣。九月三日至四日。 Pei, T. J, Kang, S. C., Hsieh, S. H., Tsai, M. H., Yeh, K. C. (2008). “Usability Testing for a 4D Construction Management Software Package,” Proceedings of EASEC-11, Taipei, Taiwan. November 19-21. Tsai, M. H., Kang, S. C., Hsieh, S. H., Kuo, C. H. ,Pei, T. J. Yeh, K. C. (2008). “Experiences on Study of Setting-up a 4D Construction Management Tool in a High-rise Construction Project,” Proceedings ofICCCBE XII, Beijing, China. October 16-18. Liao, Y.F., Hsieh, S.H., Kang, S. C., Chen, C.S., Yang, C.T., Chi, H.L., Chi, W.C., and Yu, C.H. (2007). “Development and Application of 4D Construction Simulation Tools,” Proceedings of the Fourth Civil Engineering Conference in the Asian Region (CECAR). Taipei. June 25-28. 蔡孟涵、康仕仲、郭政翰、謝尚賢 (2008),『4D 管理工具之導入案例研究』,第十二屆營建管理學術交流研討會,高雄,台灣。七月三日。 蔡孟涵、康仕仲、謝尚賢 (2008),『4D 管理系統在統包專案的應用研究』,第十二屆營建管理學術交流研討會,高雄,台灣。七月三日。 紀宏霖、洪偉翰、康仕仲(2006),『工程吊車操作與協同作業之視覺化系統』,第十屆營建管理學術交流研討會海報論文,中壢,台灣。七月四日。